A stage tent was planned for the Fusion Festival, which will be used all year round and is therefore also designed for snow loads. The PVC/PES-membrane spans between two main columns an arched girder and the outer cables. Two ridge-forming cables lead from the arch over the masts to the rear guy wires.
Client: Koch Membranen
Collaboration: TENTUM GmbH, Koch Membranen
Scope: Structural design phase 4-5 (steel & membrane)
Planning period: 2020-2021
Completion: 2021